911/112 Operator Wiki

Overflowing Sewage is a Reported Incident in 112 Operator. This incident may only occur during the Blackout event, becoming extremely common in the second half of that Duty. It requires only firefighter response, and has only one incident site.

The incident involves a sewer pit that has overflown due to a pumping station that has been disabled by the power-out. The spillage is constantly getting worse, so firefighters must rush to the site and begin manually pumping the sewage back into the pipes.

Conditions to Spawn[]

The Overflowing Sewage incident can only spawn during the Blackout event. It may not spawn at any other time.

During the 1st half of the Blackout Duty, this incident is quite rare, compared to other incidents that the event might spawn. During the 2nd half of that Duty, this incident becomes one of the most common incidents.

This incident may only spawn in one of the (three?) districts affected by the particular Blackout that's taking place. The game does not indicate to the player which districts are affected.

Resolution[]

The Overflowing Sewage incident must be reached within 1,500 seconds of real time (on SLOW game speed) or it will automatically fail. This is a very long time - more than half a Duty - but there is a growing element on the site that takes more and more work the longer it takes to reach.

The reputation reward for resolving this incident is +5.

The penalty for ignoring this incident is -5, subject to multipliers from the current difficulty setting.

112 IncidentIcon F Tech Scene Elements[]

The Overflowing Sewage incident contains one scene with a single firefighter element.

Description[]

The scene takes place in the open. The only thing present is the overflowing sewage itself - a tech element.

When the scene first spawns on the map, the sewage takes only 100 Work Seconds to clear - a rather trivial task for more tech crews. However, with every real-time second that passes (on SLOW game speed), this element takes 2 more Work Seconds to resolve. The faster that tech crews can reach this element, the less work they have to do to resolve it.

Firefighter[]

112 Element Tech Filthiness
Growing tech work Tech work Urgent
Chance to appear 100%
Tech work 100 seconds
Tech work growth +2 per second

After Action Report[]

Condition Text
All scene elements resolved The operator sent services to pump the waste to a safe place.
Scene ignored Drains from the sewage system spread outside the street. This created a danger to the health of residents.